skip to Main Content
San Carlos Apache Tribe Healthcare
San Carlos Apache Tribe Healthcare

2010 – 2012

A six-building full-service healthcare community including hospital, public health, dental, behavioral health and emergency waste treatment.

Case Study

Banner/MD Anderson Cancer Center
Banner/MD Anderson Cancer Center

2010 – 2011

150,000 sq. ft. linear accelerator treatment facility with healing procedure, lodging functions and research laboratories.

Phoenix Children’s Hospital
Phoenix Children’s Hospital

2009 – 2010

760,000 sq. ft. new 11-story tower with all the typical hospital spaces including ER, cath labs, cafeteria, pediatric rooms and redistribution of the existing electrical and life safety systems.

Case Study

Banner Desert Children’s Hospital
Banner Desert Children’s Hospital

2008 – 2009

640,000 sq. ft. new children’s 7-story tower with 150 pediatric rooms added to existing hospital; expansion of the central plant and redistribution of systems for new tower.

Banner Thunderbird Medical Center Expansion
Banner Thunderbird Medical Center Expansion

2008 – 2009

270,000 sq. ft. new 7-story tower with 160 patient rooms, ER, ancillary support spaces and remodel of the lobby, administration offices, cafeteria and medical center.

University Of Arizona Medical Center
University of Arizona Medical Center

2007

Relocation of 3 emergency generators to separate building and redistribution of emergency power system.

Case Study

Banner Gateway Medical Center
Banner Gateway Medical Center

2006

400,000 sq. ft. new full-service hospital and separate central plant facility including special systems.

Catholic Healthcare West
Catholic Healthcare West

2004 – 2006

380,000 sq. ft. 4-story new Mercy Gilbert Hospital serving as Gilbert’s first full-service acute care facility.

Case Study

Banner Baywood Medical Center
Banner Baywood Medical Center

2005 – 2006

500,000 sq. ft. central plant upgrade and special systems.

Banner Baywood Medical Center
Banner Baywood Medical Center

2002 and 2006

200,000 sq. ft. additions including (2) central plant upgrades and expansions and a new patient tower.

Mayo Clinic Hospital
Mayo Clinic Hospital

1987 – 2006

750,000 sq. ft. including clinic, (2) research buildings, family medical facility and hospital data center; special systems, turn-key.

Case Study

Phoenix Children’s Hospital
Phoenix Children’s Hospital

2003

250,000 sq. ft. complete remodel and upgrade of older facility.

Back To Top