skip to Main Content
Confidential Client
Confidential Client

2010

50,000 sq. ft., Tier 4 data floor, a phase II project built around a live phase I center. 15kV primary normal and emergency distribution and 2 MW of UPS equipment.

Case Study

Banner Health
Banner Health

2009

100,000 sq. ft., Tier 3, 15kV normal and emergency primary distribution systems. 6MW of emergency generation and 4.5 MW of UPS critical backup systems. Stand-alone facility to protect adjacent corporate headquarters.

Case Study

Apollo (University Of Phoenix)
Apollo (University of Phoenix)

2007

25,000 sq. ft. of a Tier 3 data center constructed within an existing operational building making logistics critical and difficult; 5MW of emergency generation and 2MW of uninterrupted power source equipment.

Salt River Project
Salt River Project

2007

Electrical utility company’s disaster relief/transmission recovery center that manages utility distribution throughout Arizona; Tier 2 facility with 2MW of emergency generation and 1MW of uninterrupted power source equipment.

Case Study

Wells Fargo Cosmos
Wells Fargo Cosmos

2005

A 90,000 sq. ft. facility with a 50,000 sq. ft. Tier 3 data center built on top of an existing building (space limitations required the data center be built on top of another live center); design-assist project with 20MW of emergency generation and 18MW of uninterrupted power source equipment.

Acxiom Facility
Acxiom Facility

2004

80,000 sq. ft. facility with a 30,000 sq. ft. Tier 2 data center; design-assist project with 4MW of emergency generation and 1.5MW of uninterrupted power source equipment.

Case Study