2010
50,000 sq. ft., Tier 4 data floor, a phase II project built around a live phase I center. 15kV primary normal and emergency distribution and 2 MW of UPS equipment.
2009
100,000 sq. ft., Tier 3, 15kV normal and emergency primary distribution systems. 6MW of emergency generation and 4.5 MW of UPS critical backup systems. Stand-alone facility to protect adjacent corporate headquarters.
2007
25,000 sq. ft. of a Tier 3 data center constructed within an existing operational building making logistics critical and difficult; 5MW of emergency generation and 2MW of uninterrupted power source equipment.
2007
Electrical utility company’s disaster relief/transmission recovery center that manages utility distribution throughout Arizona; Tier 2 facility with 2MW of emergency generation and 1MW of uninterrupted power source equipment.
2005
A 90,000 sq. ft. facility with a 50,000 sq. ft. Tier 3 data center built on top of an existing building (space limitations required the data center be built on top of another live center); design-assist project with 20MW of emergency generation and 18MW of uninterrupted power source equipment.
2004
80,000 sq. ft. facility with a 30,000 sq. ft. Tier 2 data center; design-assist project with 4MW of emergency generation and 1.5MW of uninterrupted power source equipment.